In a one plant there was severe problem of seal failure, One of their engineer said, if pumps will run for 1 month without any interruption,...
In 2014 we had developed NK-C Series and we had supplied first 34 pumps in same year. After two years of installation, they realized that t...
In their API-1 division they were facing leakage issues in scrubber systems. We gave our 1 no. NK Series pump for 30 days trial, after getti...
In 2019 in their expansion they required pump with larger capacity up to 249 m3/hr. As our wide range of non-metallic pumps we are able to o...
In chlorination application they had been facing mechanical seal failure in every 2-3 days because of presence of small particles in their f...